# Chandigarh to face low-pressure water supply on 12 to 13 November

2026-11-11T04:36:37+00:00 | Governance | Indian Opinion Desk

Corroboration: 1 independent outlet

Chandigarh's evening water supply will run at low pressure on 12 and 13 November because of a 48-hour shutdown for pipeline replacement work. The Municipal Corporation Chandigarh is replacing a damaged PSC rising main with a 1200 mm diameter MS pipeline at Village Sangatpura and Village Sukhmoajra under the 24x7 Water Supply Project. Raw water pumping from Phase-III Kajouli to the Water Works in Sector 39 will be suspended during the shutdown. On both days, the morning supply from 3:30 AM to 9:00 AM will be at full pressure. The evening supply from 6:00 PM to 8:30 PM will be at low pressure. The corporation has asked residents to store water in advance and cooperate during the work.

## Indian Opinion Analysis

The 48-hour shutdown affects every Chandigarh household that depends on the evening municipal supply, which will drop to low pressure on both days. Residents must store water for cooking, bathing and cleaning between 6 PM and 8:30 PM on 12 and 13 November. The work replaces a damaged rising main with a larger MS pipeline, part of a long-term 24x7 supply upgrade. The morning supply remains at full pressure, so the disruption is partial. No further outages or extension dates have been announced. Cooperation from residents is sought, but the corporation has not specified how low the evening pressure will be.

## Coverage

- indianewscalling.com <https://www.indianewscalling.com/news/191783-evening-water-supply-at-low-pressure-on-12th-13th-november.aspx>
  neutral public notice style from the corporation

This brief was synthesised by AI from the source linked above.

Tags: Chandigarh, Kajouli Water Works, Municipal Corporation Chandigarh, Sector 39
Canonical: https://indianopinion.org/chandigarh-to-face-low-pressure-water-supply-on-12-to-13-november/
License: Summary and commentary (c) Indian Opinion, reusable with attribution. Facts belong to the linked sources.
Cite: https://indianopinion.org/chandigarh-to-face-low-pressure-water-supply-on-12-to-13-november/#story-in-brief

How this brief was made: an AI model read the report linked above and wrote this summary and analysis, which were published automatically. Published briefs are sampled every hour by an automated quality check; the editor verifies its findings and approves corrections, and corrected briefs carry a dated correction line. We do no original reporting. Methodology: https://indianopinion.org/ai-use-policy/
