# Delhi plans Tehri water diversion to boost Yamuna flow by 1,300 cusecs

2026-08-20T18:46:24+00:00 | Governance | Indian Opinion Desk

Corroboration: 1 independent outlet

The Delhi government is planning to increase the Yamuna's environmental flow by 1,300 cusecs by routing water through the Tehri Dam reservoir to the Hindon river, and separately reducing transmission losses in a canal network supplying the capital. A senior Delhi government official said a presentation reviewed by the government also includes diverting 500 cusecs to the Yamuna through a proposed 29-km pipeline, aiming to ensure 1,800 cusecs is available at Okhla Barrage. The Delhi Jal Board has issued a letter of intent to Water and Power Consultancy Services to prepare a detailed project report, expected by October this year, which the government will then submit to the ministry of housing and urban affairs. A joint survey by DJB and Uttar Pradesh Jal Nigam was conducted on June 29. Separately, the government is working with Haryana's irrigation department to repair the Delhi sub-branch canal system, where nearly 30% of the 330 cusecs released for drinking water is lost before reaching the city. A broader plan includes six projects across Delhi zones, with an estimated cost of Rs 15,000 crore, funded through the urban challenge fund, DJB contributions, and loans from HUDCO and NABARD. The government is also planning to regulate groundwater extraction and finalise a new policy. These measures collectively aim to increase the Yamuna's lean-season flow and improve the efficiency of Delhi's water supply system.

## Indian Opinion Analysis

Delhi's water crisis is perennial, with the Yamuna carrying barely enough flow during summer to dilute sewage and sustain aquatic life. The Tehri Dam, completed in 2006 on the Bhagirathi in Uttarakhand, primarily generates hydropower, and diverting its stored water involves complex interstate agreements under the upper Yamuna River Board. The 30% canal loss is typical of ageing open channels: lining them can cut losses to below 10%, but cost-sharing between Delhi and Haryana has historically been a sticking point. The Rs 15,000 crore estimate, if approved, would be one of the largest single water infrastructure spends for the capital. Watch for the project report deadline in October: if delayed, the lean-season flow target for next summer will slip. The key next step is the detailed project report due this October.

## Coverage

- timesofindia.indiatimes.com <https://timesofindia.indiatimes.com/city/delhi/delhi-plans-to-route-tehri-dam-water-fix-leaky-canals-to-boost-yamuna-flow/articleshow/133385697.cms>
  Straight news agency style reporting with no discernible slant, leads with government plans and official quotes.

This story was synthesised by AI from the source linked above.

Tags: Delhi Jal Board, HUDCO, Nabard, Tehri Dam, Yamuna
Canonical: https://indianopinion.org/delhi-plans-tehri-water-diversion-to-boost-yamuna-flow-by-1300-cusecs/
License: Summary and commentary (c) Indian Opinion, reusable with attribution. Facts belong to the linked sources.
Cite: https://indianopinion.org/delhi-plans-tehri-water-diversion-to-boost-yamuna-flow-by-1300-cusecs/#story-in-brief

Review state: restored archive article, accurate at time of publication, not offered to search indexes.

How this brief was made: an AI model read the report linked above and wrote this summary and analysis, which were published automatically. Published briefs are sampled every hour by an automated quality check; the editor verifies its findings and approves corrections, and corrected briefs carry a dated correction line. We do no original reporting. Methodology: https://indianopinion.org/ai-use-policy/
