### Quick Summary
– Two important roads in Chennai, Arcot Road and Mount poonamallee Road, will be repaired post-Chennai Metro Rail Limited (CMRL) construction work.- The Highways Department has invited tenders for repair and re-laying of these roads too enhance driving comfort.- Initial focus will be on constructing missing links of stormwater drains to mitigate flooding risks during the monsoon.
– Detailed repair plans include:
– ₹3.44 crore allocated for a 1.4 km stretch on Arcot Road.
– ₹5.20 crore allocated for 800 metres on Mount Poonamallee Road.
– Additional repairs: spaces along crash barriers, junctions connecting side roads to main arterial routes.
– Re-laying work will begin after the monsoon season; surface profile corrections are planned beforehand.
– Syed Munna, an ambulance driver, highlighted that poor road conditions delay medical transport and exacerbate patient discomfort during travel.
– Jude Mathew from Tamil Nadu Self-reliant Vehicle Owners’ Association flagged widespread damage across smaller city roads due to ongoing civic projects.
### Indian Opinion Analysis
The restoration of Arcot Road and Mount Poonamallee Road is critical for improving driving conditions in Chennai-a city grappling with infrastructure-related challenges amidst expansive urban advancement initiatives like CMRL’s metro projects. The prioritization of repairing stormwater drains reflects practical foresight aimed at addressing chronic issues such as flooding during the monsoon season.
While residents may have endured inconveniences due to prolonged construction activities, systematic efforts post-construction signal a renewed focus on public safety and smoother traffic flow. Perspectives shared by an ambulance driver and vehicle owners’ association underscore the necessity of maintaining motorable roads-not only to enhance daily commutes but also vital services such as medical transport.
The ₹8+ crore investment appears strategically distributed across vulnerable stretches needing immediate attention while postponing complete re-laying till after seasonal rains-an approach that balances urgency with logistical planning for longer-term durability.
#### Read More: