Mizoram Welcomes First Train Service on Bairabi-Sairang Line, Connecting Aizawl Faster

IO_AdminAfrica7 hours ago6 Views

Swift summary

  • Event: Mizoram receives its first railway connection in over 75 years.
  • Project Details: The Bairabi-Sairang railway line spans 51.38 km, connecting Aizawl (Mizoram) to Silchar (Assam).
  • Travel Time Impact: Reduces travel time from ten hours by road to three hours by train.
  • Cost and Engineering: built at a cost of ₹5,021 crore; includes 48 tunnels, 55 major bridges, and the iconic Bridge No. 144 (taller than the Qutub Minar).

Read More


Indian Opinion Analysis

The completion of Mizoram’s first-ever railway connection marks a notable milestone for infrastructure advancement in India’s northeastern region. By drastically reducing travel time between Aizawl and Silchar, this line is expected to enhance regional connectivity and facilitate economic growth, trade opportunities, and mobility for residents of Mizoram-a state traditionally reliant on road transport.

The engineering feat demonstrates India’s capability for large-scale infrastructural projects in challenging terrains such as mountainous regions. Though, sustained efforts towards maintaining quality infrastructure and integrating the northeast better into national transportation networks will be essential for long-term benefits.

0 Votes: 0 Upvotes, 0 Downvotes (0 Points)

Leave a reply

Recent Comments

No comments to show.

Stay Informed With the Latest & Most Important News

I consent to receive newsletter via email. For further information, please review our Privacy Policy

Advertisement

Loading Next Post...
Follow
Sign In/Sign Up Sidebar Search Trending 0 Cart
Popular Now
Loading

Signing-in 3 seconds...

Signing-up 3 seconds...

Cart
Cart updating

ShopYour cart is currently is empty. You could visit our shop and start shopping.