# RBI extends Belapur turnstile tender deadline to 2 December

2026-11-27T11:01:21+00:00 | Governance | Indian Opinion Desk

Corroboration: 1 independent outlet
Outlets counted: rbi.org.in

The Reserve Bank of India has extended the bid closing date for a tender to supply and install three full-height turnstiles at its office building in Belapur, Navi Mumbai. Bids must now be submitted by 12 noon on 2 December 2026. The tender covers two outdoor dual-lane turnstiles on the ground floor and one indoor turnstile on the first floor. The RBI said Part I of the tender will open at 12 noon on 3 December. The e-tender was uploaded to the Central Public Procurement Portal on 29 October 2026. The bank advised interested bidders to apply as early as possible to avoid delays.

## Indian Opinion Analysis

The extension gives interested bidders additional time to prepare submissions for the turnstile installation contract at the Belapur office. The notice does not explain why the deadline changed or state how many bidders have applied. It identifies the next stages as the revised bid closing and the opening of Part I. Bidders must submit by 12 noon on 2 December 2026, before Part I opens at 12 noon on 3 December.

## Coverage

- rbi.org.in <https://www.rbi.org.in/scripts/BS_ViewTenders.aspx?id=26253>
  States revised tender dates and scope without advocacy

This brief was synthesised by AI from the source linked above.
Update, 27 November 2026: this story has been refreshed. Last updated 2026-11-27T14:37:06+00:00.

Tags: Belapur, Navi Mumbai, Reserve Bank of India
Canonical: https://indianopinion.org/rbi-extends-belapur-turnstile-tender-deadline-to-2-december/
License: Summary and commentary (c) Indian Opinion, reusable with attribution. Facts belong to the linked sources.
Cite: https://indianopinion.org/rbi-extends-belapur-turnstile-tender-deadline-to-2-december/#story-in-brief

How this brief was made: an AI model read the report linked above and wrote this summary and analysis, which were published automatically. Published briefs are sampled every hour by an automated quality check; the editor verifies its findings and approves corrections, and corrected briefs carry a dated correction line. We do no original reporting. Methodology: https://indianopinion.org/ai-use-policy/
