ONGC commissions India’s first geothermal wells in Ladakh
The ONGC Energy Centre commissioned India's first two geothermal wells in July 2026 at Puga Valley, Ladakh, at an altitude of over 14,000 feet. Each well is drilled to 1,000 metres and…
The ONGC Energy Centre commissioned India's first two geothermal wells in July 2026 at Puga Valley, Ladakh, at an altitude of over 14,000 feet. Each well is drilled to 1,000 metres and…
The government is preparing to repower around 25 GW of ageing wind projects, Union Minister Pralhad Joshi said at Windergy India 2026 in Chennai on 8 October. The Hindu BusinessLine put the…
The Ministry of New and Renewable Energy (MNRE) has directed all wind turbine manufacturers on the Approved List of Models and Manufacturers (ALMM) to submit compliance details on cybersecurity protocols by the…
The ministry of new and renewable energy (MNRE) has issued an advisory granting a four-month extension to the scheduled commissioning dates of renewable energy projects that were due on or after 28…
The Ministry of New and Renewable Energy (MNRE) and MyGov have invited entries for a mural design contest for the Bharat Renewable Energy Summit and Expo 2026. The winning design, with the…
The Union Cabinet is set to consider the third phase of the Green Energy Corridor (GEC), with a planned outlay of over ₹50,000 crore, senior officials told The Hindu and Livemint. The…
Daily rooftop solar installations under the PM Surya Ghar Muft Bijli Yojana rose from 5,000 in October 2025 to over 16,300 in July 2026, Union Minister Pralhad Joshi said on Thursday. The…
Ashin Xavier: interesting
IO Repro: Repro test v4 after fix 2 Oct. Safe to trash.
IO Repro: Repro test v3 after fix 2 Oct. Safe to trash.
IO Repro: Repro test after fix 2 Oct. Safe to trash.