
The Election Commission of India has summoned the two rival factions of the Trinamool Congress for a formal hearing on Friday, 27 November 2026, in New Delhi over their competing claims to the party name 'All India Trinamool Congress' and its 'Grass and Flower' electoral symbol. One faction is led by former West Bengal Chief Minister Mamata Banerjee and her nephew Abhishek Banerjee, the other is led by Leader of the Opposition Ritabrata Banerjee.
Both sides have completed their affidavit submissions following a Supreme Court order on 28 September directing the ECI to adjudicate the dispute within three months. The Mamata Banerjee-led faction currently operates under the interim name Mamata All India Trinamool Congress (MAITC) with the 'football player' symbol, while the Ritabrata Banerjee-led faction uses the Democratic Trinamool Congress (DTC) name and the 'envelope' symbol.
The ECI is expected to either allot the original name and symbol to one faction or freeze both, directing the groups to continue with their interim designations. The hearing is set for 4 pm at the poll panel's headquarters, though TMC MP Kalyan Banerjee of the Mamata camp said his faction was summoned for 3 pm.
The coverage from both outlets is uniform straight reporting, with no discernible slant. Morung Express and Times Now both lead with the hearing date and the competing claims, and both attribute the procedural timeline to the Supreme Court order of 28 September. The only factual variance is the hearing time: Times Now reports the EC summons at 4 pm but also quotes Mamata camp MP Kalyan Banerjee saying his faction was called at 3 pm, while Morung Express reports 4 pm for both. The EC's two possible outcomes, allotment to one faction or freezing of the name and symbol, are identically stated in both. The next step is the hearing itself on 27 November, which will determine whether the poll panel proceeds to a final decision or defers further.
Coverage: 2 sources, 2 neutral
Sources (2): morungexpress.com (neutral report), timesnownews.com (neutral report)
This brief was synthesised by AI from the 2 sources linked above, so one read covers every framing they carry. Methodology and corrections.