Uttar Pradesh Power Corporation Limited has directed discoms to ensure 24-hour uninterrupted electricity supply across the state during Chhath Puja, with no scheduled power cuts.

Principal secretary, energy and UPPCL Chairman Ranvir Prasad on Saturday (14 November 2026) instructed officials to ensure adequate lighting at Chhath Puja ghats and promptly address local power disruptions. Managing directors of discoms and chief engineers have been asked to keep repair teams, trolley-mounted transformers and essential equipment ready for emergencies.
Officials have also been directed to monitor transformer loads, inspect electricity lines and repair loose wires and leaning poles, particularly near puja venues. Maintenance teams across Purvanchal, Madhyanchal, Paschimanchal and other discoms have been placed on alert.
The directive targets the peak festival period when demand spikes and local faults can cause complaints. UPPCL has not published a contingency plan for severe weather or grid failures, leaving the onus on discom-level teams to respond. The real test will be how quickly trolley-mounted transformers and repair crews reach ghats if a breakdown occurs during puja hours.
Source: timesofindia.indiatimes.com
This brief was synthesised by AI from the source linked above. Methodology and corrections.