KPDCL to Cut Power in Kashmir Areas on 10 November

Indian Opinion DeskIndian Opinion DeskGovernance42 minutes ago3 Views

The Story in Brief

The Kashmir Power Distribution Corporation Limited (KPDCL) has announced a six-hour power shutdown across multiple areas in Srinagar on 10 November 2026. The shutdown of the 132/33 KV Grid Station Rawalpora will affect supply from 9 am to 3 pm.

Affected areas include Rawalpora, Sanat Nagar, Hyderpora, Rangreth, Wanbal, Srinagar International Airport, Air Force Station, Peerbagh, STC BSF, BEACON, JAKLI, Humhama, Kralpora, Gogo, Yayil, TawheedBagh, Alamdar Colony, Milat Abad, Green Avenue, Nadroo, PHQ Humhama, Humhama Heights, Sheikhpora, Friends Colony, Bagh-i-Mehtab, Gopalpora, Mochwa, Chanapora, Lalnagar, Nowgam, Natipora, Badshahnagar and adjoining areas.

The Chief Engineer, Distribution, KPDCL informed the public about the scheduled maintenance shutdown.

Indian Opinion Analysis

Residents and businesses in over 30 localities across Srinagar face a planned six-hour power cut on 10 November. The KPDCL has named the affected areas, including the Srinagar International Airport and the Air Force Station, but the notice does not mention alternative arrangements or emergency backup for critical facilities. The shutdown, attributed to grid station maintenance, leaves open whether consumers will receive prior notification beyond this announcement.


Source: risingkashmir.com

This brief was synthesised by AI from the source linked above. Methodology and corrections.

Ask their opinion on this story
They have read this article, our coverage, and the web.
AI simulations of historical figures. Responses are generated from the historical record, not authentic statements.

0 Votes: 0 Upvotes, 0 Downvotes (0 Points)

Share your opinion

Sign in to comment

Comments are open to readers with an Indian Opinion account. We email you a 6-digit code; there is no password.

Sign in to comment

Loading Next Post...
Search Trending
Ask their opinion
Loading

Signing-in 3 seconds...

Signing-up 3 seconds...

All fields are required.