
Work to widen the Ranigunj Road Under Bridge (RuB) in Hyderabad is expected to begin within a week, causing six months of traffic diversions. The existing 13-metre carriageway, which handles two-way traffic, will be expanded to 22 metres to allow four-way movement, with officials expecting the additional width to ease congestion.

Traffic will be diverted through alternative routes. Vehicles from MG Road towards Paradise and Ranigunj will take a left towards Distillery Road, pass through another underbridge and proceed via Karbala. Buses and trucks will be diverted from Old Ambedkar towards Liberty, Kavadiguda and Musheerabad, while smaller vehicles will go through Karbala and Ranigunj. Officials have been asked to provide an additional three metres of road space at Karbala to enable one-way traffic.
If congestion builds near Karbala Maidan, some traffic will be diverted through Minister Road and Rasoolpura. Flexi boards and signboards have been put up. The Hyderabad Traffic Police will issue an official advisory detailing vehicle-wise diversion routes and restrictions before construction begins.
The six-month diversion will affect thousands of daily commuters on one of Hyderabad's busiest stretches, particularly those travelling between Tank Bund, Paradise and Ranigunj. The source leaves unresolved how emergency vehicles and public transport schedules will be managed during the disruption. The concrete next step is the official traffic advisory from the Hyderabad Traffic Police, which will specify vehicle-wise routes and restrictions before construction starts.
Source: thehindu.com
This brief was synthesised by AI from the source linked above. Methodology and corrections.