Green Energy Corridor Phase 3 sent to Cabinet for approval
The Union Cabinet is set to consider the third phase of the Green Energy Corridor (GEC), with a planned outlay of over ₹50,000 crore, senior officials told The Hindu and Livemint. The…
The Union Cabinet is set to consider the third phase of the Green Energy Corridor (GEC), with a planned outlay of over ₹50,000 crore, senior officials told The Hindu and Livemint. The…