
ISRO on Thursday, 12 November 2026, successfully conducted a ground static test of the modified third stage (PS3) of its Polar Satellite Launch Vehicle at the Satish Dhawan Space Centre in Sriharikota.

The test follows two consecutive PSLV mission failures, PSLV-C61/EOS-09 in May 2025 and PSLV-C62/EOS-N1 in January 2026, where anomalies occurred in the third stage. ISRO said it comprehensively reviewed design margins, raw material acceptance criteria, assembly procedures and quality checks before introducing modifications. These include improvements to the nozzle configuration and mechanical interfaces, with added redundancy in sealing systems.
ISRO said the test data will undergo detailed analysis before further tests are planned. The space agency has not announced a date for the rocket's return to operational flights.
All three outlets carry the same news, ISRO’s successful ground static test of the modified PSLV third stage on 12 November, and attribute every technical detail to the space agency’s statement. No outlet foregrounds criticism of ISRO’s pace or questions the two-year gap since the last failure, they report the modifications and the committee findings as official facts. The Times of India adds the most context on the two failures (dates, satellite weights, specific anomaly descriptions), while The Hindu and Deccan Chronicle stay closer to the agency’s press release. The coverage is uniform straight reporting, the only difference is length. The next step named by all sources is ISRO’s detailed analysis of test data before further tests are planned.
Coverage: 3 sources, 3 neutral
Sources (3): timesofindia.indiatimes.com (neutral report), thehindu.com (neutral report), deccanchronicle.com (neutral report)
This brief was synthesised by AI from the 3 sources linked above, so one read covers every framing they carry. Methodology and corrections.
Update, 12 November 2026: this story now draws on 3 sources.