
Maharashtra has made check dams mandatory alongside every new bridge built over rivers and streams under state and Central government projects. The decision was taken on Wednesday, 25 November, at a meeting of the Cabinet Sub-Committee on Drought Mitigation, chaired by Revenue Minister Chandrashekhar Bawankule. The government aims to retain at least one metre of water beneath each bridge.
The rule covers bridges built by state agencies and under the Chief Minister’s Gram Sadak Yojana. The government is also planning bridge-cum-check dams on the proposed Shaktipeeth Expressway and considering small lakes on grazing land. It extended the Gaalmukt Dharan scheme deadline until June 30. The scheme supplies removed tank silt to farmers free of cost, removal costs Rs. 32 per cubic metre and transport Rs. 37, with a maximum subsidy of Rs. 37,500.
Hindustan Times and CNBC-TV18 offer uniform straight reporting, leading with the bridge rule and presenting the drought and water shortage as the reason for it. Both explain the one-metre retention target and list the agencies covered, while also including the proposed lakes and the Gaalmukt Dharan scheme. Neither report gives a projected water-storage gain or a timetable for implementing the bridge requirement. The scheme’s stated deadline is June 30.
Coverage: 2 sources, 2 neutral
Sources (2): hindustantimes.com (neutral report), cnbctv18.com (neutral report)
This brief was synthesised by AI from the 2 sources linked above, so one read covers every framing they carry. Methodology and corrections.