Solan students cross swollen khad on iron pipes to reach school

Schoolchildren in Sunnu Tikri village in Himachal Pradesh's Solan district are crossing the swollen Ashwani Khad on discarded iron pipes and a rope trolley to reach school, a Times Now Navbharat ground…

Schoolchildren in Sunnu Tikri village in Himachal Pradesh's Solan district are crossing the swollen Ashwani Khad on discarded iron pipes and a rope trolley to reach school, a Times Now Navbharat ground report has found. Villagers say a permanent bridge has been repeatedly promised but never built.

Solan students cross swollen khad on iron pipes to reach school

A video of the crossing went viral online. The report states children from Classes 1 to 12 must travel about a kilometre to Dhole Ka Jubbar School after the local government primary school, in operation since 1949, was merged in July 2025 due to falling enrolment. During heavy monsoon rains, the water level and current increase sharply. Younger children are carried by parents or older students, while others hold hands in a human chain.

According to residents, proposals for three bridges at Sunnu Tikri, Gyura and Kyar were made earlier. Bridges at two locations were constructed, but the Sunnu Tikri bridge allegedly remained on paper. Residents are demanding immediate action to build a permanent bridge.

Indian Opinion Analysis

The Times Now Navbharat ground report frames the story through a crisis lens, leading with the viral video and the drama of children risking their lives. The report foregrounds the failure of authorities: a bridge was promised but remained 'confined to official paperwork' while two other bridges in neighbouring hamlets were built. The contrast between official inaction and the makeshift pipes-and-rope solution is the central accusation. The measured read is that the school merger (July 2025) created the current crossing necessity, but the core demand, a permanent bridge at Sunnu Tikri, is a long-standing infrastructure gap. What to watch: whether the viral attention and fresh reporting force a timeline for construction from the state public works department.

Coverage: 1 source, 1 government-critical


Source: timesnownews.com (government critical)

This story was synthesised by AI from the source linked above.

Ask their opinion on this story
They have read this article, our coverage, and the web.
AI simulations of historical figures. Responses are generated from the historical record, not authentic statements.

0 Votes: 0 Upvotes, 0 Downvotes (0 Points)

Share your opinion

Loading Next Post...
Search Trending
Ask their opinion
Loading

Signing-in 3 seconds...

Signing-up 3 seconds...

All fields are required.