Tejasvi Surya urges halt to Hebbal tunnel project

Tejasvi Surya writes to CM DK Shivakumar on short tunnel project at Hebbal

Bengaluru MP Tejasvi Surya has written to Chief Minister DK Shivakumar demanding that the Rs 1,140 crore Hebbal Short Tunnel project not proceed without a scientific assessment. Surya said experts have raised…

The Story in Brief

Bengaluru MP Tejasvi Surya has written to Chief Minister DK Shivakumar demanding that the Rs 1,140 crore Hebbal Short Tunnel project not proceed without a scientific assessment. Surya said experts have raised serious concerns about the tunnel's design, safety, and integration with the city's long-term mobility network. The proposed tunnel passes through Hebbal Lake.

The Deccan Herald reports that Surya shared his letter on social media, calling for a review before any construction begins. The project, a key infrastructure plan for Bengaluru, has faced criticism over its environmental impact and feasibility.

The Indian Opinion

This is not the first time a Bengaluru infrastructure project has sparked controversy over environmental clearance. The tunnel's route through Hebbal Lake invites scrutiny, but sceptics must note that every major city has built under water bodies. The real test is whether the government releases a full, independent study on soil stability and flood risks before spending a single rupee. Without that, neither side can claim the moral high ground.


Source: deccanherald.com

This story was synthesised by AI from the source linked above.

Ask their opinion on this story
They have read this article, our coverage, and the web.
AI simulations of historical figures. Responses are generated from the historical record, not authentic statements.

0 Votes: 0 Upvotes, 0 Downvotes (0 Points)

Share your opinion

Loading Next Post...
Search Trending
Ask their opinion
Loading

Signing-in 3 seconds...

Signing-up 3 seconds...

All fields are required.