
The Northeast Frontier Railway (NFR) says it cannot provide a timeline for restoring the Lumding-Badarpur Hill Section, the only rail link connecting Tripura, Mizoram, Manipur and southern Assam with the rest of…
The Northeast Frontier Railway (NFR) says it cannot provide a timeline for restoring the Lumding-Badarpur Hill Section, the only rail link connecting Tripura, Mizoram, Manipur and southern Assam with the rest of India. The disruption has lasted over a fortnight after heavy rain caused soil subsidence near New Harangajao station in Dima Hasao district, affecting two of three tracks over 300 metres. The NFR has cancelled trains, including the Guwahati-Silchar Express, and imposed night restrictions from 7 pm to 5 am. Meanwhile, NDTV reports that the link has been restored and train services have resumed, citing a visit by the NFR General Manager to inspect the tracks. The two outlets disagree on the current status of the line.
The claim that the flood-damaged rail link has been 'restored' clashes with the NFR's own admission that it cannot give a restart date. This is not the first time a government agency has declared a job done while the ground reality remains messy. The test will be whether passenger trains run without restrictions on the single functioning line. Until the NFR openly says night restrictions are lifted and all trains are back on schedule, the restoration is incomplete.
Sources (2): assamtribune.com, ndtv.com
This story was synthesised by AI from the 2 sources linked above.
Updated: this story now draws on 2 sources.