
The Indian Federation of Green Energy has urged the petroleum ministry to extend the compressed biogas (CBG) blending obligation from city gas distributors to refineries, petrochemicals, and other large industrial consumers. The…
The Indian Federation of Green Energy has urged the petroleum ministry to extend the compressed biogas (CBG) blending obligation from city gas distributors to refineries, petrochemicals, and other large industrial consumers. The body argues that distributors alone cannot bear the cost of scaling up, and that including industrial buyers would boost demand as blending targets rise.

The plea comes after the Union Cabinet approved the Rs 23,731 crore GOBARdhan National Circular Bioenergy Scheme, targeting a tenfold increase in CBG production by FY36. Yet infrastructure lags: of 207 CBG plants, only 24 are connected to gas pipelines, while 148 have no connectivity planned, according to a PNGRB report cited by the Economic Times.
The narrative around GOBARdhan as a seamless waste-to-fuel revolution ignores the pipeline bottleneck. Only 2 of 328 plants under construction have gas connectivity. Current blending of 0.92% has already missed the 1% mandate. The real test is whether the government ties its Rs 23,731 crore outlay to mandated pipeline access for all plants, not just those near city gas networks.
Sources (2): energy.economictimes.indiatimes.com, timesofindia.indiatimes.com
This story was synthesised by AI from the 2 sources linked above.
Updated: this story now draws on 2 sources.