Assam minister inspects Bhogdoi embankments, plans Rs 4,000 cr protection

Indian Opinion DeskIndian Opinion DeskGovernance49 minutes ago2 Views

Assam Water Resources Minister Sushanta Borgohain on Friday inspected the Bhogdoi River embankment in Jorhat and announced that excavation and strengthening work along the river basin would begin soon. Reconstruction of five…

Assam Water Resources Minister Sushanta Borgohain on Friday inspected the Bhogdoi River embankment in Jorhat and announced that excavation and strengthening work along the river basin would begin soon. Reconstruction of five embankment sections damaged by recent floods has been completed using geo-bag tubes following the chief minister's directive, he said.

Assam minister inspects Bhogdoi embankments, plans Rs 4,000 cr protection

Borgohain said the government now plans wider measures to strengthen the Bhogdoi basin from its origin near the Assam-Nagaland border to its confluence with the Brahmaputra. The work will deepen shallow portions and improve water flow without digging the river like a drain. The government is in touch with the World Bank for a second phase of embankment repair and reconstruction.

The minister estimated that the large-scale embankment reconstruction and strengthening programme could require around Rs 3,000-4,000 crore. Six embankments in Jorhat district and one in Sivasagar district were breached during the recent floods. The government also plans to secure the Dorika and Dikhow rivers and rebuild vulnerable embankments in those areas.

Indian Opinion Analysis

Assam's recurrent floods have made embankment breaches a near-annual crisis, with the Brahmaputra and its tributaries eroding thousands of hectares of land each year. The World Bank has previously funded flood management projects in Assam, including the Assam Integrated Flood and Riverbank Erosion Risk Management Project. The Rs 3,000-4,000 crore estimate suggests the scale of vulnerability in the Bhogdoi basin, which affects densely populated riverine areas in Jorhat and Sivasagar. The next step is securing the World Bank's phase-two funding, which will determine how quickly the planned work can begin.


Source: assamtribune.com

This brief was synthesised by AI from the source linked above.

Ask their opinion on this story
They have read this article, our coverage, and the web.
AI simulations of historical figures. Responses are generated from the historical record, not authentic statements.

0 Votes: 0 Upvotes, 0 Downvotes (0 Points)

Share your opinion

Loading Next Post...
Search Trending
Ask their opinion
Loading

Signing-in 3 seconds...

Signing-up 3 seconds...

All fields are required.